Menu

Cheaper from day one. Independent of subsidies.

Hyca doesn't save money with a trick but with two simple effects. Both grow as more cheap electricity reaches the grid.

Calculate your business case
lower heat cost (LCOH)
~12 %
savings per year at 10 MW, net
~€0.5 million
efficiency
up to 98 %
payback compared with a new gas boiler
< 2 years

~12 %: Levelised cost of heat (LCOH) compared with a gas boiler, over the plant's lifetime, including investment, maintenance and energy. Calculated without subsidies using our cost model; the exact figure depends on your energy prices and operating hours.

Two effects that add up

  1. 01

    More heat from every cubic metre of gas

    Catalytic combustion reaches up to 98 % efficiency. A typical gas boiler is at about 91 %.

  2. 02

    Electricity when it's cheap

    The Smart Energy Controller switches to electricity in the hours when it's cheaper than gas. The more operating hours, the more of those hours the plant uses.

The drivers

  • Operating hours: the more hours, the more cheap electricity windows.
  • Your energy prices and contracts for electricity and gas.
  • Your grid connection: it limits how much heat can be made electrically.
  • The carbon price: it makes the gas path more expensive and switching more attractive.

Everything included

Hardware, control, software, optimisation and maintenance all come from us, from one source. You buy the plant, and we make sure it runs on the cheaper energy source every hour. We're happy to talk about other models too, such as delivering heat instead of a plant.

Read on.

What would Hyca save you?

Four quick questions about your process. We calculate your business case and get back to you with an individual design.

Question 1 of 4